Wednesday, April 16, 2014

Day 2..

Making progress:

This is a shot of the bench/step deep end exit.


Shot of the spa, one side cut down, framework for slide.


Waterfall on side of pool, framed and chicken wired.


A shot of what will be the wet deck (play shelf).  The finished deck will be the size of the orange outline.  This is all the concrete they've been busting up, it will be used as filler.




Another shot of the soon to be wet deck.

Can't wait to see what tomorrow brings.  The plaster guys should be here to sandblast all the existing plaster off the inside of the pool and spa.


No comments: