Today was concrete day..
They shot the waterfall..
The slide..
Here's another shot of the exit bench in the deep end..
And, the play deck. Not sure if anything has changed on the exit step or deck since last posting.
And more importantly, a big pow wow between the contractor, Ed and the electrician who came out to go over his electrical plans!! (I think he starts tomorrow, while the contractor is not here due to the concrete having to take a day or so to dry).
While I see lots of progress being made, it seems that with more and more progress the pool (and yard) become more and more of a mess!
Monday, April 28, 2014
Thursday, April 24, 2014
No Work Today..
A lot of concrete was poured yesterday and I imagine it needs some time to dry. No one showed up to work today, but a delivery was made at 7am. I heard a noise out front and looked out the window to find this..
very large truck in front of our house. A little while later it was gone, but had left this:
So excited to see what's next!
very large truck in front of our house. A little while later it was gone, but had left this:
So excited to see what's next!
Day 5 (of days worked)...
I came home from work today and found this collection of trucks in the street in front of our house..
by the end of the day, this is what was accomplished, you can actually see things forming up pretty well now.
Here are some close ups of each feature.
This is the wet deck or play shelf.
This is the side waterfall. You can also see the beginnings of the plumbing at the top and bottom.
This is the slide and waterfall over the spa.
We're getting there!!
by the end of the day, this is what was accomplished, you can actually see things forming up pretty well now.
Here are some close ups of each feature.
This is the wet deck or play shelf.
This is the side waterfall. You can also see the beginnings of the plumbing at the top and bottom.
This is the slide and waterfall over the spa.
We're getting there!!
Friday, April 18, 2014
Day 4...
The plaster company came back this morning and coated the inside of the pool and spa with some kind of very rough bonding material. Then the contractor spent the day working on the slide infrastructure. Starting to see a little plumbing appear too. The play shelf area gets fuller and fuller of discarded materials every day!
Day 3..
Today the plaster company came out and sandblasted the entire inside of the pool and spa, removed all the tile and removed the exit steps in the deep end. The contractor will be back tomorrow!
Wednesday, April 16, 2014
Day 2..
Making progress:
This is a shot of the bench/step deep end exit.
Shot of the spa, one side cut down, framework for slide.
Waterfall on side of pool, framed and chicken wired.
A shot of what will be the wet deck (play shelf). The finished deck will be the size of the orange outline. This is all the concrete they've been busting up, it will be used as filler.
Another shot of the soon to be wet deck.
Can't wait to see what tomorrow brings. The plaster guys should be here to sandblast all the existing plaster off the inside of the pool and spa.
This is a shot of the bench/step deep end exit.
Shot of the spa, one side cut down, framework for slide.
Waterfall on side of pool, framed and chicken wired.
A shot of what will be the wet deck (play shelf). The finished deck will be the size of the orange outline. This is all the concrete they've been busting up, it will be used as filler.
Another shot of the soon to be wet deck.
Can't wait to see what tomorrow brings. The plaster guys should be here to sandblast all the existing plaster off the inside of the pool and spa.
Tuesday, April 15, 2014
Day 1..
They came out yesterday and dropped a pump into the pool to drain it overnight. This morning the contractor showed up and went to work. Can't believe how much they did in one day!
Sunday, April 13, 2014
Pool Renovation..
After 26 years we are having a major renovation done to our pool. We will be updating the blog daily with pictures for the next month while the work is in progress. Tonight is demoliton eve, so here is the before picture..
Subscribe to:
Posts (Atom)